News


 bullet  News Releases
 bullet  Industry News
 bullet  Analyst Coverage

News Releases

2008 January 7

EXPLORATION UPDATE

Vancouver, January 7, 2008 - Xemplar Energy Corp (TSX-Venture: XE, Frankfurt: E7R, Namibia: XEM) (“Xemplar” or the “Company”) is pleased to report on the progress at its Warmbad Project (EPL’s 3567 and 3568) in Namibia. The company wishes to report that there are no material changes in the company’s activities and that the company is still waiting for assay results from samples submitted in December 2007. These samples are from 13 holes previously drilled and the results from these samples are expected by the end of January 2008. These samples were dispatched to Set Point Labs in Johannesburg, South Africa, an ISO 17025-accredited laboratory.

Drilling Progress – Warmbad

Drilling on the Company’s Warmbad project will recommence on the 15th of January 2008 using three drilling rigs. This will be increased to five rigs by the end of January when two more RC drilling rigs are delivered.

On behalf of the Board of Directors,
Xemplar Energy Corp

“W.G. McDowall”
President and CEO

 

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE. THIS NEWS RELEASE SHALL NOT CONSTITUTE AN OFFER TO SELL OR THE SOLICITATION OF AN OFFER TO BUY SECURITIES IN ANY JURISDICTION. "SAFE HARBOR" STATEMENT UNDER THE PRIVATE SECURITIES LITIGATION REFORM ACT OF 1995: THIS NEWS RELEASE CONTAINS FORWARD LOOKING STATEMENTS THAT ARE NOT HISTORICAL FACTS AND ARE SUBJECT TO RISKS AND UNCERTAINTIES WHICH COULD CAUSE ACTUAL RESULTS TO DIFFER MATERIALLY FROM THOSE SET FORTH IN OR IMPLIED HEREIN.

Go back to the previous page

© Copyright Xemplar Energy Corporation. All Rights Reserved.
For more information, please contact us.